Results Per Page | Showing 1-1 of 1 Results
| 1
Answer:
Ever since the NFPA 72 (2013) was instituted, a 6-hour Test Timer may be required to be programmed in your Gemini C-Series (GEMC), Firewolf or FireLink control panel. Proceed as follows:
...
View Answer
40 Results Per Page | Showing 1-1 of 1 Results
| 1