Filter By Brand

FAQs By Category

Results Per Page | Showing 1-14 of 14 Results | 1

What factors should I consider when using an external power supply with a Gemini control panel?

Answer:
We recommend that you consider an external power supply for your system if the power draw is close to the maximum allowed by the control panel.  
...

How can I test the programming of an existing Test Timer feature?

Answer:
To test the programming of an existing Test Timer feature:
...

What are the available devices compatible with the NAPCO control panels equipped with a 3-wire bus?

Answer:
The GEM-P800 and GEM-P801 control panels are equipped with a 3-wire bus, therefore the only devices that are compatible are:
...

I want to use a StarLink Connect Communicator, an iBridge IBR-ZREMOTE module and other iBridge system components with an older GEM-P816 or GEM-P1632 control panel running firmware version 10D How do I upgrade this older control panel firmware to V31BA (or higher)?

Answer:
If you wish to use the iBridge IBR-ZREMOTE module, other iBridge system components or a StarLink Connect Communicator with an older GEM-P816 or GEM-P1632 control panel running firmware version 10D, this older control panel firmware must be upgraded...

The total power draw from all connected devices exceeds the power rating of my control panel. How do I install an auxiliary power supply with a Gemini control panel?

Answer:
If the total power draw from all connected devices exceeds the power rating of the control panel, install an auxiliary power supply as follows:
...

With the Gemini control panels GEM-P816, GEM-P1632, GEM-P1664, can I use the keypad to enable the Test Timer feature using "Direct Address Programming"?

Answer:
Yes, Test Timer programming can be performed using the keypad only when the following are both true: 
...

How do I keypad program a Test Timer schedule (a 7 Day, 8 Hour or 1 Hour schedule) with a Model MA1008e Version 2 control panel?

Answer:
Normally the control panel sends a Test Timer report daily, but if you prefer a weekly test, or an 8 hour test, or a 1 hour test, program as follows:
...

The total power draw from all connected devices exceeds the power rating of my control panel. How do I install an auxiliary power supply?

Answer:
It is always important to be mindful of and to calculate the total auxiliary power draw from all connected devices.  Overdrawing control panel power can damage the control panel or cause unpredictable troubles and false alarms.
...

With control panels GEM-P3200, GEM-P9600 and GEM-X255, I am installing an auxiliary power supply for keypads, EZMs and other powered devices. How do I wire these devices properly?

Answer:
With control panels GEM-P3200, GEM-P9600 and GEM-X255, wire the device power to the auxiliary power supply DC positive and negative.  Then install a wire between the auxiliary power supply DC negative and control panel common (either terminal 10...

I am installing an auxiliary power supply for keypads, EZMs and other powered devices. How do I wire this properly?

Answer:
Wire the power to the devices to the auxiliary power supply’s DC positive and negative.  Then install a wire between the auxiliary power supply DC negative and panel common (either terminal 6 or terminal 10 will work with the GEM-P816,...

When using a Magnum Alert or Gemini control panel Wizard, the message reads "Caution, out of system". What should I check?

Answer:
The "Wizard 1" (marked as just "Wizard"), is only for use with the Magnum Alert MA1000 series control panels.  Only the "Wizard 2" works with the Gemini GEM-P3200 and GEM-P9600 control panels.
...

With all Gemini series control panels, how do I program EZ Arm (Easy Arm) one button arming?

Answer:
EZ Arm provides one button arming for non-security critical premises.  Disarming still requires a valid user code.
...

40 Results Per Page | Showing 1-14 of 14 Results | 1